100,000 sf mixed use retail/office building. Project included foundations, 20 ft walls, slab on deck, suspended slab
Durham NC – 2013
160,000+ sf office building and parking deck
Raleigh NC – 2015
Restaurant building, colored concrete slabs, architectural joint pattern
Durham NC – 2015
50,000 sf addition and renovation to assisted living center
Durham NC – 2015
Addition and renovation to SAS Bldg. R Data Center
Cary NC – 2015
Addition to Duke Raleigh Hospital including footings, walls, and piers
Raleigh NC – 2012
Linear accelerator addition at Duke Raleigh Hospital, including Matt foundation, walls, and framed slab
Raleigh NC – 2014
21,000 sf office and research facility
Cary NC – 2012
Footings and slab on grade
Durham NC – 2013
Residential dormitory housing complex (5 buildings) and amenities bldg. Project included footings, foundations, framed walls, slab on metal deck, and site work.
Elon NC – 2012
Outdoor arena concrete seating and foundations, including monolithic pour water fountain.
Durham NC – 2012
45,000 sf, including footings, walls, slab on metal deck, cast-in-place trenches
Durham NC – 2013
New baseball stadium with on grade seating, walls, cast-in-place dugouts.
Holly Springs NC – 2014
Addition and renovation of Durham Bulls stadium
Durham NC – 2013-14
Renovation of indoor sports facility. Project included foundations, walls, slab on metal deck, topping slabs.
Raleigh NC – 2015
New hotel with 50,000 sf of mixed use retail and hotel space. Project included 22ft tall exposed walls and decorative concrete at the swimming pool area
Durham NC – 2013
48,000 sf included decorative concrete, board formed walls, radius walls, footings, foundations, slab on metal deck, water feature.
Raleigh NC – 2015
New hotel, 45,000 sf. Project included fountains, walls, framed slabs, and beams.
Durham NC – 2015
32000 sf, including foundations, slab on grade, slab on metal deck.
Raleigh NC – 2015
130,000 sf of concrete paving
Durham NC – 2013